Melerie Guinto Pineda VICTORIA, TARLAC, REGION III- CENTRAL LUZON
Description
The ten-year Local Government Solid Waste Management Plan showcases the segregation of wastes generated in the locality including reduce, re-use, recycle, composting, and include other components of the Solid Waste Management
Implementation
Biodegradable wastes are processed into organic fertilizer and charcoal briquettes thru the established MRF at Palacpalac, Victoria. All the biodegradable waste collected at Poblacion areas are handled by the MRF for processi
Strategies
Garbage collector brings these wastes in scheduled days. For strict compliance, utility workers at the MRF check the garbage for shredding, and afterwards are being stocked for decomposition in a period of thirty days.
Project Result
The Open Dump site located at Barangay Masalasa was officially closed. Thus, the wastes beneficial for possible pulverizing technology are being transferred to the MRF while wastes that are not viable will be dumped at Metro-
Message
No comments yet.